November 2018 Easy18 Construction Updates

It has been a very productive few weeks for TownX, the Easy18 structure and block work are now fully complete and finishing works have begun. Ongoing construction works include the following: 

  •  Ground floor high level MEP
  •  First floor tiles fixing
  •  Second to third floor plastering, painting and coating
  •  Third and fifth floor MEP wall conducting
  •  Roof AC conducting and third floor AC drain pipe inside riser
  •  ONV content on second floor
  •  Front elevation plaster preparation
  •  Ground, second and third floor HVAC raiser duct and branch connection, rod fixing, ducting, insulation
  •  First floor PPR main line
  •  Third and fourth floor TV pull box fixing on
  •  Fourth floor drainage high level and fifth floor drainage risers
  •  WC flush tank fixing

See more updates on the Easy18 Construction Updates webpage