There are many stages of a construction project, a lot of things need to happen from initial idea to sales. With that being said, we’re proud to announce that sales will commence on time in February 2018.
Works performed include the following:
• Raft & retaining wall & lift pit steel fabrication
• Raft & retaining wall waterproofing
• Raft drainage layout and graphic tests
• Raft screed casting
• Raft concrete casting around the drainage pipes
• Raft lighting protection pit
• PVC water stopper
• Raft tower crane section fixing